Owner: Formosa Plastics Corporation
Project: Replacement of EDC Piperack Fireproofing
Engineer: Formosa Plastics Corporation
General Contractor: Mirage Industrial Group
Project Type: $1,800,000.00

Project Description

Demo and replace pipe rack structure fireproofing.

Work Performed
  • Scaffold installation
  • Fireproofing demo
  • Blasting and surface treatment of underlying structural steel
  • Installation of epoxy corrosion prevention system
  • Lathe and corner bead installation
  • Fireproofing installation per manufacturer’s specification
  • Sealing surface treatment
Accomplishment

Mirage为保护这一关键的管架结构,已签约更换老化的防火材料.

Challenges

申博sunbet的专家脚手架建造者的能力在这个项目中得到了测试! 在带电线路、阀门、泵等运行单元内和周围工作使任务具有挑战性. 此外,申博sunbet的客户要求100%控制演示阶段产生的任何灰尘/碎片. Mirage与申博sunbet的客户紧密合作,以出色的成品成功完成了这个项目.

Capability:

Owner: Formosa Plastics Corporation
Project: LDPE Concrete Super Structure, Trenches, and Area Paving
Engineer: Formosa Plastics Corporation
General Contractor: Mirage Industrial Group
Project Type: $2,300,000.00

Project Description

由于申博sunbet的可靠性和效率,海市蜃楼被台塑承揽了这个非常紧急的项目. 这个关键的结构有一个非常紧凑的时间表,120天的开始完成. 三层混凝土上层建筑建造在大型混凝土基座上,并将其固定在60英尺的混凝土桩上. 为了适应高压管道,这个结构将容纳, engineers required level and plumb of less than 1/16“. The high pressure piping was affixed to the structure via > 200 meticulously placed steel embed plates that were poured monolithic into the columns and beams.

Work Performed
  • Layout
  • Pile cutoff
  • Material procurement and installation.
  • Formwork / shoring EPC
  • Cast-in-place concrete columns and beams
  • Cast-in-place concrete trenches and accessories
  • Concrete paving
Accomplishment

该项目100%自主完成,按时完成,QA/QC完美无缺.

Challenges

Accelerated schedule and very precise QA/QC requirements.

为了满足进度要求,在申博sunbet合同之外的其他承包商在该区域工作,在申博sunbet公司之外的协调是至关重要的.

为了使这个项目成功,必须加快表格打包和支撑工程及材料的采购.

Capability:

Owner: Formosa Plastics Corporation
Project: EHS Contractor Parking, Roads and TxDOT entryway
Engineer: Formosa Plastics Corporation/ Urban Engineering
General Contractor: Mirage Industrial Group
Project Type: $1,450,000.00

Project Description

Roadwork and parking lot consisted of 1,038,500 SF of fly ash stabilized subgrade, compacted fly ash base, and chip seal. Mirage还与EPC签订了TxDOT加速和减速车道连接到繁忙的高速公路.

Work Performed
  • Layout
  • One course chip seal
  • Roadway and parking lot striping
  • One course chip seal at roads
  • Basework for TxDOT entryway
  • 2″ hot-mix asphalt over 1 course chip seal at entry way
  • Traffic control
  • Parking lot and entryway striping
Accomplishment

申博sunbet的客户依赖Mirage安装这个停车场和道路工程,以适应50亿美元的扩张带来的大量劳动力.

Challenges

与TxDOT以及最终用户合作,确保各方都能满意.

Capability:

Owner: Formosa Plastics Corporation
Project: HDPE-3 Access Roads and Site Works
Engineer: Formosa Plastics Corporation
General Contractor: Mirage Industrial Group
Project Type: $900,000.00

Project Description

Mirage was contracted by Formosa Plastics to clear, survey, grade, and achieve drainage at the virgin site. 道路施工包括33.3万SF的石灰稳定路基、石灰石基层和切屑密封. 新建的道路非常坚固,幻影公司随后在16条道路上进行了运输,492 tons of limestone to install material laydown yards.

Work Performed
  • Layout
  • Site clearing  
  • SWPPP  
  • Drainage  
  • Cast in place concrete headwalls  
  • Lime stabilization  
  • Lime stone base installation and compaction  
  • One course chip seal at roads  
  • 铺设场土工格栅和石灰石的铺设和压实 
Accomplishment

这个项目至关重要,因为整个扩建都依赖于保险箱, proper, 并及时安装现场工作,为其他行业调动和开始工作,这部分的50亿美元的扩张. Mirage self-performed every aspect of this project. 

Challenges

在规定的时间内完成工作,防止延误单位的施工活动.

Capability:

Owner: Formosa Plastics Corporation
Project: LDPE Main Control Room
Engineer: Lantana Engineering
General Contractor: Mirage Industrial Group
Project Type: $3,983,476.00

Project Description

Mirage was contracted by Formosa Plastics to EPC a 20,000 SF防爆控制室,钢框架和8英寸厚的定制预制混凝土板.

Work Performed
  • Engineering and structural analysisLayout
  • Site clearing
  • Excavation and lime stabilization
  • Electrical grounding grid
  • 现浇混凝土建筑基础、级梁和楼板
  • Procurement and erection of all structural steel components
  • Slab on metal deck placement and nelson stud welding
  • Procurement and erection of all blast proof wall panels
  • 采购和安装防爆电气化门窗
  • Built up roofing system
  • Miscellaneous steel embeds, ladders, door landings, steps etc.
Accomplishment

Completed the project on schedule and under budget. 项目需要业主和申博sunbet公司之间大量的通信和合作. This went smoothly and efficiently, 所有业主的需求和要求都得到了及时有效的满足.

Challenges

Working several aspects of the job at once. 优秀的协调和沟通对这个项目的成功至关重要.

Capability:

Owner: Buckeye Partners
Project: Corpus Christi Tank Farm
Engineer: Engineering & Terminal Services
General Contractor: Buckeye Partners
Project Type: $1,126,862.00

Project Description

Mirage与Buckeye Partners签约,为其新的液化石油气储存设施安装消防水回路.

Work Performed
  • Fabricated and installed 4,150 L.F. underground pipe
  • 安装所有的消防监视器,消防栓和消防站
Accomplishment

有效地完成项目,没有OSHA可记录的事故或时间损失事故.

Challenges

在区域内开展项目,以满足业主对区域启动工厂的需求.

Capability:

Owner: Trafigura AG
Project: George West Terminal
Engineer: Govind Development
General Contractor: Trafigura
Project Type: $1,387,962.00

roject Description

Mirage与托克公司签订合同,为其安装管道和新的George West终端,并与通过现场的ETC线路进行连接.

Work Performed
  • Fabricated and installed 4,870 L.F. pipe
  • Set 3 mechanical pumps
  • 制作安装消防水回路、消防水监控器、消防水泵.
Accomplishment

有效地完成项目,没有OSHA可记录的事故或时间损失事故.

Challenges

在有限的空间和有限的资源下与其他几个现场承包商合作.

Capability:

Owner: EF90
Project: New 60 Acre tank farm
Engineer: Engineering and Terminal Services
General Contractor: Mirage Industrial Group
Project Type: $ 5,800,000.00
Total Man-hours: 79,000
Status: Complete

Project Description

海市蜃楼被召来协助位于科珀斯克里斯蒂的一个新坦克场的扩建.

Work Performed
  • Built to grade 60 Acre site
  • Installed all underground drainage
  • Installed underground firewater
  • Displaced and located 13,500 loads of general fill
  • Installed 45 catch basins to create adequate drainage
Accomplishment

Effectively completed the project with 0 recordable injuries.

Challenges

与现有土地所有人协调,分阶段拆除管道和管架.

Capability:

Owner: Formosa Plastics
Project: Fractionation – II Plant Site Development and Heavy Haul Road
Contracting Agency Address & Phone:
Formosa Plastics
201 Formosa drive
Point Comfort, TX
(361) 987-7000
Amount: $1,623,000.00

Project Description

海市蜃楼承建台塑新植草根项目

Work Performed
  • Hauled in, spread and compacted 24,000 tons of limestone base
  • 将15000立方码的一般填充物拖入并压实
  • Lime stabilized 400,000 sq.ft. Pad
  • Installed 2,400 linear feet of 6’ chainlink fence
  • 700 linear feet of drainage pipe
  • 18,000 sq. yd. of heavy haul road
Key Accomplishment

在60个日历天内完成,所以业主可以按计划开始新的扩张

Challenges

Scheduling and coordinating 1,700箱材料要运进一个入口有限的化工厂.

Capability:

OWNER: FORMOSA PLASTICS
PROJECT: 25% IEM EXPANSION
Contracting Agency Address & Phone:
Formosa plastics
201 Formosa drive
Point Comfort, TX
(361) 987-7000
Amount: $941,500.00

PROJECT DESCRIPTION

采用台塑收缩法建立膨胀式卤水蒸发器结构

WORK PERFORMED
  • ERECTED 570,000 LBS STEEL STRUCTURE
  • INSTALLED 1100 SQUARE FEET OF Q-DECKING
  • INSTALLED 6000 SQUARE FEET OF GALVANIZED GRATING
  • POURED 35 CUBIC YARDS AT EL.60
KEY ACCOMPLISHMENTS
  • 有效地完成项目,没有OSHA可记录的事故或时间损失事故.
CHALLENGES
  • 在不干扰工厂运行的情况下,将新的钢结构与现有的钢结构捆绑在一起.